 ==== 10th Week Report ==== ==== 10th Week Report ====
 -Student Week- -Student Week-
 +
 +==== 11th Week Report ====
 +During this week we focus our work on closing the list of materials to start building the prototype. The list was nearly closed before the meeting with supervisors except servo motors and battery, as we made a number of design changes that reduced the number of servo motors would we need. Once approved modifications to the project, we closed the list to have the material next week and start building.
 ===== Meetings ===== ===== Meetings =====
  
Line 213: Line 216:
     - Isa.isep.ipp.pt     - Isa.isep.ipp.pt
   * The connectors should be easy for kids, so solder the cables is not the best solution. Also think about which type of connectors we need   * The connectors should be easy for kids, so solder the cables is not the best solution. Also think about which type of connectors we need
- + 
 +==== 11th Meeting (2016-05-25) ===== 
 +NA 
 + 
 +==== 12th Meeting (2016-06-02) ==== 
 +  -Are our parts printed? 
 +  -Casa Dos Vedantes does not sell sheet rubber, only string. It may work, but not what the fist was designed for. 
 +    -Reprint bottom half of fish 
 +    -Find somewhere that sells sheet 
 +  -How do we get material on hand that could be repurposed for the fin 